Move your email to Google

We review Yandex mailboxes and domain records. After a test transfer, we plan your Google Workspace migration together.

  • Clear agreed scope
  • Planned implementation
  • Fit with your infrastructure
YandexGoogle Workspace
  • Gmail
  • Drive
  • Meet
  • Docs
  • Sheets
  • Calendar
Email migration
  • Yandex
  • Users
  • Test transfer
  • Google
Manufacturer product page

Why Yandex → Google Workspace?

Keep your domain

Keep current addresses when domain rights and verification allow it.

Test transfer first

Check transfer results and the destination mailbox with a sample account.

User preparation

Prepare accounts and sign-in information around the migration schedule.

Product Portfolio

Tell us about your migration

What you get with ITD

Requirements and selection

We review the system and agree product and licence needs.

Design and installation

We check compatibility and apply agreed settings.

Testing and handover

We run usage tests and hand over agreed documentation.

Support and maintenance

Support channels, hours and maintenance work follow the agreement.

Work, support hours and deliverables are defined in the agreement. Additional requests are assessed separately.

Cloud and Collaboration

How we work

  1. Preparation

    We review accounts, mailbox volumes and domain permissions.

  2. Test migration

    We transfer a sample account and check folders and messages.

  3. Live migration

    We enable accounts and mail routing at the agreed time.

  4. Support

    We complete final checks and user support within the agreed scope.

Frequently asked questions

Which product or plan fits?

Selection follows user, device and usage requirements. Licensing and technical compatibility are checked before quoting.

Are calendars and contacts migrated too?

IMAP email transfer does not include calendar or contact data. The source format and a separate migration method must be reviewed.

Can data loss or downtime occur?

Access limits, source errors and DNS changes can affect results. Tests, source backups and rollback steps help assess risks; loss-free or uninterrupted migration is not promised.

What determines cost and timing?

User and device counts, site conditions and required work are assessed. Fixed cost or timing is not promised before review.

Let’s define your requirements

Tell us about your current system and priorities. We can agree on a suitable scope of work.

Get a Quote